Racks that drew 4 kW now draw 40. Most existing halls were not designed for that, and the binding constraint is rarely where people assume — it is often the cooling return path or the busway, not the utility feed. We measure what the room can actually take, sequence the upgrade so the load stays live through it, and price liquid cooling honestly against the alternative of building elsewhere.
Next step
Two working days, written down, and no fee until you sign it.
Or write to us directly hello@nextgendc.example